Feel free to sign up for a bonus
JamesDean
0
29
2023.12.05 20:46
As the construction of the site for the construction of
Gangwon Land Luge was suspended due to cracks and
https://johnf219jvh2.wikiannouncing.com/user ground subsidence,
at least 3.6 billion won was spent, with the budget already executed approaching 16 billion won.
http://www.xn--9m1b93joyk7pau9do4qovb.com/bbs/board.php?bo_table=64&wr_id=265
With the stability confirmation process underway,
https://forums.stardock.com/user/7298818 it is unclear whether
the construction will be able to resume, raising concerns about budget waste.
According to data submitted by Kim Yong-min of the Democratic Party of Korea, a member
of the National Assembly's Trade, Industry and Energy Small and Medium Venture Business
Committee, on the 24th, the total budget for the luge project is 19.9 billion, with 15.8 billion already executed.
Gangwon Land failed to prevent cracks, which required at least 3.6 billion won and up to 5.1
billion won in project costs (estimated amount)
https://pablog832jwe1.bloggazza.com/profile from its originally planned budget.
If the stability research service determines that it is difficult to resume construction and stops the construction, 15.8 billion won will be wasted money.
Earlier, Gangwon Land had been pushing for a luge site
construction project since February 2019, but on December 20, 2021,
cracks such as slopes near the hill stop and the subsidence of the lift pillar foundation
structure occurred. Currently, the luge site project is undergoing stability research services to establish measures.
Representative Kim said, "Luge is a leisure facility that children enjoy riding, so they should make
every effort to manage safety," and emphasized, "Gangwon Land should further strengthen its facility safety
management system and consider how to use the luge site, which has been spent 15.8 billion won, if the site is deemed unsuitable for the luge project."
<a href='http://pongpong79.com' target='_blank'>ㅤ
^^사진^^
</a>
http://www.igmph.com/bbs/board.php?bo_table=free&wr_id=44829
Gangwon Land Luge was suspended due to cracks and
https://johnf219jvh2.wikiannouncing.com/user ground subsidence,
at least 3.6 billion won was spent, with the budget already executed approaching 16 billion won.
http://www.xn--9m1b93joyk7pau9do4qovb.com/bbs/board.php?bo_table=64&wr_id=265
With the stability confirmation process underway,
https://forums.stardock.com/user/7298818 it is unclear whether
the construction will be able to resume, raising concerns about budget waste.
According to data submitted by Kim Yong-min of the Democratic Party of Korea, a member
of the National Assembly's Trade, Industry and Energy Small and Medium Venture Business
Committee, on the 24th, the total budget for the luge project is 19.9 billion, with 15.8 billion already executed.
Gangwon Land failed to prevent cracks, which required at least 3.6 billion won and up to 5.1
billion won in project costs (estimated amount)
https://pablog832jwe1.bloggazza.com/profile from its originally planned budget.
If the stability research service determines that it is difficult to resume construction and stops the construction, 15.8 billion won will be wasted money.
Earlier, Gangwon Land had been pushing for a luge site
construction project since February 2019, but on December 20, 2021,
cracks such as slopes near the hill stop and the subsidence of the lift pillar foundation
structure occurred. Currently, the luge site project is undergoing stability research services to establish measures.
Representative Kim said, "Luge is a leisure facility that children enjoy riding, so they should make
every effort to manage safety," and emphasized, "Gangwon Land should further strengthen its facility safety
management system and consider how to use the luge site, which has been spent 15.8 billion won, if the site is deemed unsuitable for the luge project."
<a href='http://pongpong79.com' target='_blank'>ㅤ
^^사진^^
</a>
http://www.igmph.com/bbs/board.php?bo_table=free&wr_id=44829